Johnston St, Abbotsford:

  • Client – PACE
  • 2,000m2
  • Bulk & Detailed Excavation – 10m Depth in Slightly Weathered to Fresh Basalt
  • Dewatering
  • Contamination Removal
  • Capping Beam
  • Shotcrete Wall
  • Raft and Footing Construction
  • Crane Base
  • Drainage Layer
  • Concrete Blinding Layer